Construction stages

When should you plan the electrical installation, automation and network?

Ideally at the design or shell stage – the earlier, the cheaper. After plastering, every change to cable routes means chasing walls and, in an energy-efficient house, a risk to airtightness; a wireless system does not increase the cost where power is already available.

Five stages

What do we do at each stage?

For each stage we describe what we do then, what later changes cost and what the next step is.

  1. Best moment

    Design

    Guidelines: distribution board, routes, shading

    Stage details →
  2. Best moment

    Open shell

    Conduits, penetrations without thermal bridges

    Stage details →
  3. Good

    Closed shell (windows installed)

    Drives, window contacts, airtight penetrations

    Stage details →
  4. Last call

    Before plastering

    Cabling, airtightness test

    Stage details →
  5. Another route

    After plastering

    Wireless systems, minimal wall chasing

    Stage details →
  6. Another route

    Renovation / retrofit

    Installation assessment, wireless systems

    Stage details →

Construction stages

What do changes cost at the following stages?

It costs least at the design or shell stage. The later it gets, the more changes to a wired installation require chasing walls; wireless systems are the exception.

Construction stages, scope of work and cost of changes
StageWhat we do thenCost of changes
DesignGuidelines for the design: distribution board, routes, external shadinglowest
Open shellConduits and penetrations without thermal bridges, Power supply for blind boxeslow
Closed shell (windows installed)Blind and shading drives, Window contacts, Airtight installation penetrationslow
Before plasteringCabling, Measurements, Presence at the airtightness testmedium
After plasteringWireless systems (Loxone, Ampio, Somfy), Minimal wall chasinghigherapplies to wired installations; with a wireless system the cost does not increase
Renovation / retrofitAssessment of the existing installation and distribution board, Wireless systems where there are no cableshigherapplies to wired installations; with a wireless system the cost does not increase

FAQ

Frequently asked questions

At which construction stage is it best to contact you?

At the design or shell stage, before plastering. At that point we plan the distribution board and routes based on the floor plan, and changes cost least. In renovations we use wireless systems.