Skip to content
Architektura
Systemów

Energy-efficient buildings

How to plan installations in an energy-efficient or passive house?

Together with the architect and site manager, before the airtight layer is made: routes on its inner side, control of shading, ventilation and the heat pump, and airtight installation penetrations.

New Polish building regulations (technical conditions) are being prepared. We design ahead of the announced requirements and the EPBD directive; we will update this information once the regulation is published.

See also: Energy

What we do

What do installations bring to an energy-efficient building?

Automation keeps the building from overheating in summer, runs ventilation according to need, and the installations do not compromise airtightness.

  • Shading against overheating

    Blinds and venetian blinds controlled by sun, wind and time of day.

  • Ventilation control

    Heat recovery ventilation output according to CO₂, humidity and occupancy.

  • Airtight installation penetrations

    Routes on the inner side of the airtight layer.

  • Heat pump and PV

    Common control, power balancing.

Complementary services

Who carries out the airtightness test, energy audit and thermal retrofit?

These works are done by partners with the relevant qualifications. For each service we state whether we coordinate it or recommend a partner.

  • We coordinate – done by a partner

    Carried out by: partner carrying out airtightness tests

    Airtightness test (blower door)

    After the airtight layer and before finishing; we are on site and seal our own penetrations.

  • We recommend a partner

    Carried out by: qualified energy auditor

    Energy audit

    Assessment of the building and improvement options; we adapt the automation to the results.

  • We coordinate – done by a partner

    Carried out by: partner carrying out insulation and window work

    Thermal retrofit

    Insulation and windows are done by a partner; we do the electrical installation, automation and shading control.

  • We recommend a partner

    Carried out by: Fabryka Wnętrz · Facebook · Instagram

    Interior design

    Panels, lighting and switches planned together with the interior design.

Construction stages

When to plan installations in an energy-efficient house?

It costs least at the design or shell stage. The later it gets, the more changes to a wired installation require chasing walls; wireless systems are the exception.

Construction stages, scope of work and cost of changes
StageWhat we do thenCost of changes
DesignGuidelines for the design: distribution board, routes, external shadinglowest
Open shellConduits and penetrations without thermal bridges, Power supply for blind boxeslow
Closed shell (windows installed)Blind and shading drives, Window contacts, Airtight installation penetrationslow
Before plasteringCabling, Measurements, Presence at the airtightness testmedium
After plasteringWireless systems (Loxone, Ampio, Somfy), Minimal wall chasinghigherapplies to wired installations; with a wireless system the cost does not increase
Renovation / retrofitAssessment of the existing installation and distribution board, Wireless systems where there are no cableshigherapplies to wired installations; with a wireless system the cost does not increase

FAQ

Frequently asked questions

Do you carry out energy audits and airtightness tests?

Not ourselves – the airtightness test is carried out by a partner, which we coordinate while sealing our own penetrations; for an energy audit we recommend a qualified auditor. We adapt the installations to the results.

Next step

Let us get in touch with your architect or site manager

We will agree the routes, penetrations through the airtight layer and the date of the airtightness test.

Arrange a call