Skip to content
Architektura
Systemów

Who we work for · Contractors and trade companies

Contractors and trade companies: your product integrated into the building system

You install windows and shading, gates, heat pumps or run the whole construction, and the client expects everything to work together. We prepare cabling guidelines before plastering, integrate your product with the building system, commission it together with you and stay for the service.

  • „The client asks whether our product will work with their smart home.”
  • „During installation there is no power supply or control cable.”
  • „Who will configure the device together with the rest of the system?”

Trades

What do we offer your trade?

The same in every trade: cabling guidelines before plastering, integration of your product with the building system, joint commissioning and service.

  • Windows and shading

    windows, roller blinds, external venetian blinds, awnings, pergolas

    • Cabling guidelines before plastering: power for blind boxes, drives and sun and wind sensors
    • Integration of drives with the building system – smart home or building automation
    • Joint commissioning and scene checks
    • Service after commissioning – [terms]
  • Gates and doors

    gate drives, garage doors, entrance doors, access control

    • Cabling guidelines before plastering: power for drives, cables for sensors and readers
    • Integration of gate drives, doors and access control with the building system
    • Joint commissioning and entry scenario checks
    • Service after commissioning – [terms]
  • HVAC and renewables

    heat pumps, heat recovery ventilation, photovoltaics, energy storage, EV chargers

    • Cabling guidelines before plastering: power and communication cables (e.g. Modbus)
    • Integration of devices with control and energy management
    • Joint commissioning and checks with the building system
    • Service after commissioning – [terms]
  • General contractors and developers

    buildings delivered as a whole

    • Cabling guidelines at the design stage and a schedule of work before plastering
    • Electrical, automation and network with one party responsible
    • Joint commissioning, acceptance and as-built documentation
    • Service after commissioning – [terms]

Construction stages

Ideally before plastering – that is when we plan cables for your devices

It costs least at the design or shell stage. The later it gets, the more changes to a wired installation require chasing walls; wireless systems are the exception.

Construction stages, scope of work and cost of changes
StageWhat we do thenCost of changes
DesignGuidelines for the design: distribution board, routes, external shadinglowest
Open shellConduits and penetrations without thermal bridges, Power supply for blind boxeslow
Closed shell (windows installed)Blind and shading drives, Window contacts, Airtight installation penetrationslow
Before plasteringCabling, Measurements, Presence at the airtightness testmedium
After plasteringWireless systems (Loxone, Ampio, Somfy), Minimal wall chasinghigherapplies to wired installations; with a wireless system the cost does not increase
Renovation / retrofitAssessment of the existing installation and distribution board, Wireless systems where there are no cableshigherapplies to wired installations; with a wireless system the cost does not increase

FAQ

Frequently asked questions

At which construction stage is it best to contact you?

At the design or shell stage, before plastering. At that point we plan the distribution board and routes based on the floor plan, and changes cost least. In renovations we use wireless systems.

Next step

Let us talk about cooperation

Partner contact