Skip to content
Architektura
Systemów

Who we work for · Public buildings

Public buildings: open standards and documentation for acceptance

A school, council office, sports or cultural facility: the system must be possible to describe in a tender, accept and service years later. That is why we work with open standards and hand over full as-built documentation.

  • „How do we describe automation in a tender without naming one brand?”
  • „After a few years nobody knows how the installation works.”
  • „We need to check whether the building requires a building automation system (BACS).”

Three layers

What do we combine into one system?

We design the electrical installation, automation and network together, so they work as one system with one party responsible.

Electrical

  • Installations and distribution boards
  • Protected circuits for automation and the network

Automation and security

  • Lighting in the DALI standard
  • Heating and ventilation – integration via Modbus
  • KNX where the tender requires it

IT

  • Network divided into VLANs
  • Wi-Fi
  • Cabling measurements

Construction stages

Ideally at the stage of describing the subject of the tender

It costs least at the design or shell stage. The later it gets, the more changes to a wired installation require chasing walls; wireless systems are the exception.

Construction stages, scope of work and cost of changes
StageWhat we do thenCost of changes
DesignGuidelines for the design: distribution board, routes, external shadinglowest
Open shellConduits and penetrations without thermal bridges, Power supply for blind boxeslow
Closed shell (windows installed)Blind and shading drives, Window contacts, Airtight installation penetrationslow
Before plasteringCabling, Measurements, Presence at the airtightness testmedium
After plasteringWireless systems (Loxone, Ampio, Somfy), Minimal wall chasinghigherapplies to wired installations; with a wireless system the cost does not increase
Renovation / retrofitAssessment of the existing installation and distribution board, Wireless systems where there are no cableshigherapplies to wired installations; with a wireless system the cost does not increase

Who does the work

What do partners do?

Some work requires other qualifications. For each of them we state clearly whether we coordinate it or recommend a partner.

  • We coordinate – done by a partner

    Carried out by: partner carrying out airtightness tests

    Airtightness test (blower door)

    After the airtight layer and before finishing; we are on site and seal our own penetrations.

  • We recommend a partner

    Carried out by: qualified energy auditor

    Energy audit

    Assessment of the building and improvement options; we adapt the automation to the results.

  • We coordinate – done by a partner

    Carried out by: partner carrying out insulation and window work

    Thermal retrofit

    Insulation and windows are done by a partner; we do the electrical installation, automation and shading control.

FAQ

Frequently asked questions

Does a commercial building need a building automation system (BACS)?

It depends on the output of the heating or cooling installation. We check this for the specific building.

Next step

Let us review the description of the tender

Tender description consultation